港股代码:2188 | 简 体 | 繁 体 | English
Home / About Us / Case
  • 1

    Water Diversion project (central route) Beijing-Shijiazhuang Section

    The emergent water supply engineering, Beijing-Shijiazhuang Section is a part o..

  • 2

    East Lanzhou 750 KV substation

    The substation is located in Yuzhong city, east Lanzhou, Gansu province with a ..

  • 3

    Tianjin subway project

    The No. 1 Tianjin subway is from Shuanglin to Liuyuan, totally 24 substations w..

  • 4

    Jiuquan Satellite Launch Center

    All substations in the launch base for the first Chinese manned spaceflight adop..

  • 5

    Qinghai-Tibet Railway

    Qinghai-Tibet railway is the first railway line with the highest altitude in Ch..

1页,共1页5条记录,每页12条
<<<1>>>  

版权所有:珠海星空平台(中国)科技公司科技股份有限公司 2012版权所有  粤ICP备10036002号


公众号 公众号